Nov. 04, 2024
Posted 4/23/ 16:55 (#)
Subject: How soon after pouring concrete can I set anchor bolts?
Yipeng supply professional and honest service.
Kingdom of Callaway - Fulton, Mo
( (full).jpg)
If you are looking for more details, kindly visit anchor bolt installation.
( (full).jpg)
The contractor has doweled anchors with HIT-HY 200 MAX adhesive into 4,500 psi concrete (1) day after the concrete has been poured. Per ACI 318, concrete should be a minimum of (21) days old. Is there any way to evaluate the possible reduction in anchor capacity due to the concrete not being fully cured at the time of anchor installation? Are there any known failure modes associated with installation into the uncured concrete?
For more information, please visit Anchor Bolt.
If you are interested in sending in a Guest Blogger Submission,welcome to write for us!
All Comments ( 0 )