Production Process | Taiwan-Based E-Barrier Wheel Seals ...

Author: Evelyn y

May. 13, 2024

Agriculture

Production Process | Taiwan-Based E-Barrier Wheel Seals ...

1. Customers' demands
We know more about customers’ demands through communication.

For more information, please visit our website.

2. Quotation proposal
The offers will be provided after customers’ demands are confirmed.

3. Order confirmation
Purchasing orders are received and confirmed by sales representatives after the offer is accepted by customers.

4. Purchasing
We start purchasing the corresponding materials after orders are confirmed and inform the production staff of following up the status of incoming materials.

5. Incoming inspection/material inventory
The weight of metal cases has to be measured and recorded. The dimensions are randomly inspected according to the drawing of each product before transferring to the next process. If the inspection is not qualified, the metal cases will be returned to the suppliers for improvement. A part of qualified metal cases has to be processed such as grinding. We will after that apply bonding agent on the metals.
When the rubber arrives, the date, name of rubber, rubber code and batch number have to be recorded in system for further tracking. The colors of rubber have to be checked with sample for each batch and inspected in lab for certification. The use of rubber compound is based on the principle of First In, First Out. The barcode, batch number, QC qualified, and expired date have to be shown on the label before storage.


6. Production plan
The staff at production department will arrange tooling, molding machines and time of manufacturing when the materials are all ready.

xtnbk are exported all over the world and different industries with quality first. Our belief is to provide our customers with more and better high value-added products. Let's create a better future together.

Further reading:
Intensive animal farming
How to Save Money When Buying China bamboo strip making machine
Thinking of Automating?

7. Molding
When the tools and fixtures are ready, the molding time, temperature and pressure will be set up for trial. Then the operator execute first article inspection to make sure that the dimensions, seal type, marking, colour and appearance are corresponding to the specification. When the first articles are considered qualified, the molding process for batch production can be started.


8. Post Cure
A part of seals need to proceed with post cure to strengthen the adhesive. The setting of temperature and time is different for various rubber compounds. The finished parts have to be removed from the oven for cooling down after post cure.


9. Trimming / Assembly
The operators choose the appropriate fixtures, knives, speed and distance based on the size of seals for trial of trimming. After trial, the finished parts will be measured based on the drawing to make sure that the dimensions are all within tolerance before trimming process of each batch.
Some seals are combined with two (or more) components. The machines have to be adjusted before trial and measurement has to be done after the assembly.


10. Inspection of finished Parts
Random measurement and appearance check are necessary before shipment. The OD, ID, height and lip dimensions are all measured and recorded for future tracking.


11. Packing
Product part numbers, types, dimensions and color must be checked before packing. The packing way can be based on customers’ requirements. If there is no other specified, we use CHO standard packaging (plastic bags or paper wrap).


12. Shipping.

For more cassette seal manufacturerinformation, please contact us. We will provide professional answers.

92

0

Comments

Please Join Us to post.

0/2000

All Comments ( 0 )

Guest Posts

If you are interested in sending in a Guest Blogger Submission,welcome to write for us!

Your Name: (required)

Your Email: (required)

Subject:

Your Message: (required)